List of Large-Scale Tests
System Test
Construction of the system test for Seismic Testing |
Phase 1: Horizontal Seismic Testing of the system unit in the Longitudinal Direction |
Phase 2: Vertical Load Connection Testing of the system unit |
Connection Test 1
First Unit with GUSC and LUSC connection |
GUSC Test:
GUSC +3.75, -7.5 inches Displacement |
GUSC - View of the connection region |
LUSC Test:
<
LUSC +6, -12 inches of Displacement |
LUSC - Overall view |
LUSC - View of the connection region |
Connection Test 2
ESSP Connection:
ESSP - overall view |
ESSP View of the Connection Region |
ESSP view from the bottom of cap beam to |