List of Large-Scale Tests
System Test
|
Construction of the system test for Seismic Testing |
|
Phase 1: Horizontal Seismic Testing of the system unit in the Longitudinal Direction |
|
Phase 2: Vertical Load Connection Testing of the system unit |
Connection Test 1
|
First Unit with GUSC and LUSC connection |
GUSC Test:
|
GUSC +3.75, -7.5 inches Displacement |
|
GUSC - View of the connection region |
LUSC Test:
|
<
LUSC +6, -12 inches of Displacement |
|
LUSC - Overall view |
|
LUSC - View of the connection region |
Connection Test 2
ESSP Connection:
|
ESSP - overall view |
|
ESSP View of the Connection Region |
|
ESSP view from the bottom of cap beam to |